Okay, just a quick update. As was forecast, the weather was indeed snow. It looked like a wonderful winter wonderland.
Even so, I managed to sneak in a wee bit of work on getting the wood bolted to the top of the steel beams to enable the rafters to be screwed into place. The first set of rafters was added, around 20 needing to be shaped and screwed in.
I’ve got the majority of the side framing done now and I’m about to start the front wall. I’ve allowed for a large entrance to enable a Luton-style van to reverse in to make offloading cabs and materials easier.
Even with the cold, I’m amazed at nature surviving.
I’m hoping to get the front wall finished this weekend, along with the final set of upper rafters, depending on the weather of course.
Once that’s complete, it’ll be time to get the whole place boarded out and wrapped. I’m getting more excited now that it’s starting to take shape.